Plants & Facilities

Saltigo's asset base consists of a comprehensive set of plants located almost exclusively at integrated site in Leverkusen, Germany. This asset base includes:

  • A Technical laboratory/ISO kilolab
  • A cGMP kilolab and pilot plant
  • Technology plants (e. g. phosgenation, hydrogenation, distillation)
  • Multipurpose plants

We have, as components within these plants, a variety of state-of-the-art facilities available for carrying out the synthesis of your products:

  • In-house developed small-scale parallel reactors for process development
  • Mini plants
  • Simulated moving bed (SMB) units for resolution of enantiomeric mixtures
  • Distillation equipment, e. g. columns, thin-film evaporators, etc.
  • Cryogenic equipment
  • High-pressure equipment

Our extensive range of equipment materials includes glass, enamel, Hastelloy and other alloy types, and stainless steel.

Saltigo is equipped with a comprehensive set of facilities comprising a total of 3,000 m³ (750,000 gallon) of agitated reactor volume:

  • Kilo labs (typically 5-25 liter glass vessels)
  • Pilot plants (25-1,600 liter stainless steel, glass lined, and alloy vessels)
  • Production plants (2.5-16 m2, approx. 600-4,000 gallon vessels).

Downloads

News

  • 29.06.10 Saltigo at 23rd Interphex/Pharma-i Japan, Tokyo Big Site East Hall, booth 40-39 read more
  • 25.06.10 Saltigo passes FDA audit read more
  • 02.06.10 Saltigo at Chemspec Europe 2010, June 9 to 10, 2010 read more
© Saltigo 2010A company of the LANXESS Group